Send a case summary

CASE NARRATIVES

Illustrative matters

Every item below is Hypothetical / Illustrative and anonymised. They illustrate how common deals stall and how counsel organises evidence and procedure options. They are not client war stories and do not predict outcomes. We do not publish win rates or recovery percentages.

Quiet, light-filled business architecture (display illustration placeholder)
Scene illustration · display placeholder, not the firm’s premises

Every item below is Hypothetical / Illustrative and anonymised. They illustrate how common deals stall and how counsel organises evidence and procedure options. They are not client war stories and do not predict outcomes. We do not publish win rates or recovery percentages.

Hypothetical scenarios are general information, not legal advice. Real cases require permission, fact-checking and anonymisation. No success, recovery or other result is promised.

Illustrative case scene (display placeholder)Hypothetical

supplier-dispute

Hypothetical: EU importer paid a large deposit — factory never loaded the container

Scenario & challenge:Story setup (not a real client): An EU home-goods importer signed POs by email with a trading company and paid a large advance. For three months the other side kept saying on WeChat and email that a container was “booked this week” and the B/L was “coming,” but never produced a verifiable vessel voyage or packing list. The buyer’s warehouse sat empty; retail dates were fixed. Worse: the payee name on the bank slips did not fully match the contract header, and chats sometimes named a different factory short-form. Internally the team split — keep waiting, or instruct counsel to terminate and demand repayment. Evidence lived in Outlook, WeChat exports, and bank PDFs; nobody had one chronology. Possible approach:Counsel’s first five moves (illustrative path, not a promised result): (1) one table of every payment, every “we load this week” promise, every delay; (2) public-registry check of the contract entity’s code and status against the payee account; (3) read whether the payment is a deposit or ordinary advance under the contract text, and write the termination/refund bases; (4) bilingual demand letter with a cure deadline and proof of electronic service; (5) map the forum clause — keep talking, mediate, or prepare a filing — and note that without a real B/L and packing list, “goods are on the way” is not performance. Evidence first, then letters, then filing decisions.

Explore the scenario
Illustrative case scene (display placeholder)Hypothetical

supplier-dispute

Hypothetical: US importer’s goods miss the sealed sample — factory says the objection window closed

Scenario & challenge:Story setup: A US importer ordered accessories against a sealed sample. Port sampling showed size tolerance and silkscreen batches off-sample. The contract had a short inspection/objection window; most chat was on WeChat; some stock was already moving to retailers. The factory replied that the objection period had lapsed — no return, no replace. In a few days the buyer had to decide: does further distribution hurt mitigation, how to word notice against the clause, who runs the lab report, and whether to keep forum options ready while talking. Possible approach:Illustrative moves: formal notice mapped to inspection/objection clauses; preserve sample-vs-shipment photos/video and sampling method; timeline payments and delivery; weigh mitigation if goods keep selling; keep repair, replacement, price cut, or termination theories ready while negotiating. Do not sign full-and-final language before evidence is locked.

Explore the scenario
Illustrative case scene (display placeholder)Hypothetical

trademark-ip

Hypothetical: An EU brand’s Chinese transliteration was filed by a stranger

Scenario & challenge:Story setup: An EU outdoor brand preparing China e-commerce finds its Chinese transliteration filed in core classes by an unrelated individual, late in the publication window. It holds EU registrations and use, but almost no China sales record. Marketing wants to call it bad faith in public; legal counsel worries about absolute language. The brand also has not decided whether to file its own Chinese name. The clock is running — miss opposition, and later paths get heavier. Possible approach:Illustrative moves: lock filing/publication dates; assemble foreign reputation and prior-use packs; analyse classes and similar goods; structure opposition/invalidation grounds from public indicators; plan the brand’s own Chinese filing in parallel. Public wording stays procedural — no “will be invalidated” claim.

Explore the scenario
Illustrative case scene (display placeholder)Hypothetical

nnn-contract

Hypothetical: Australian brand finds a factory affiliate quoting its own retailers

Scenario & challenge:Story setup: An Australian custom-furniture brand had multi-year OEM ties with a South China factory under an English agreement labelled NNN. A retailer forwarded a quote from a suspected factory affiliate for near-identical goods. The fight will turn on whether customers were learned through the relationship, who initiated contact, whether liquidated damages might be adjusted in PRC procedure, and how hard an English-heavy template without clear Chinese-controlling and chop rules is to run. The brand wants a cease-and-desist now, but fears chats disappearing before evidence is locked. Possible approach:Illustrative moves: reconstruct when and how customer lists were disclosed; check affiliate equity filings; test whether the clause covers contact regardless of who initiates and reaches affiliates; preserve quotes, chats, and order exports; weigh cease-and-desist timing against negotiation or filings. An “NNN” label on the cover is not a win.

Explore the scenario
Illustrative case scene (display placeholder)Hypothetical

fdi-compliance

Hypothetical: German investor needs a workable document calendar for a Chengdu WFOE

Scenario & challenge:Story setup: A German industrial-software company plans a Chengdu WFOE for Asia-Pacific clients. The board fight is capital contribution timing, business-scope wording that covers implementation and training, director rules, and which parent authorisations need legalisation. Finance wants a bookkeeper first; legal wants a step-and-document map before picking partners. Nobody wants “about two or three months” — they want a checklist calendar. Possible approach:Illustrative moves: access screen under then-current FDI/registration rules; bilingual articles and appointment papers; legalisation/translation and bank onboarding touchpoints; post-setup contract/HR compliance flags. No promised approval timing or grant.

Explore the scenario
Illustrative case scene (display placeholder)Hypothetical

maritime-arbitration

Hypothetical: Singapore party with a foreign charter award maps China enforcement

Scenario & challenge:Story setup: A Singapore-linked party holds a foreign commercial award from a charter dispute and hears the respondent has China business ties. Missing on the table: full award and agreement texts, translation/authentication plan, intermediate-court nexus analysis, and a preview of procedural objections. Management’s first question is usually “can we collect” — statutory review grounds need explaining before any promise. Possible approach:Illustrative moves: Convention-aligned exhibit list; agreement formality check; domicile/asset/place-of-business nexus; recognise-then-enforce structure; outline replies to procedural defences. Recognition depends on statute and court review — this story does not preset the ruling.

Explore the scenario
Illustrative desk scene with quality inspection records and samplesHypothetical

supplier-dispute

Hypothetical: Third-party port inspection fails — factory says goods left the plant fine

Scenario & challenge:Story setup (not a real client): A Middle East buyer ordered hardware parts from an East China factory. The contract said buyer-appointed third-party inspection at port; non-conforming goods could be rejected or claimed against. After arrival, the surveyor’s report failed plating thickness and hardness on several lines. The factory pushed back at once: outgoing QC passed, ocean transit or rough handling may have caused damage, and the objection window was miscounted. On the table: PO PDF, blurry factory photos, the survey report, scattered WeChat screenshots. Warehouse rent was rising; downstream customers were chasing. Procurement wanted to withhold the balance; finance feared a counterclaim for non-payment. Nobody had lined up which standard the contract actually cited, whether sampling method was in the text, or whether the report was ready to attach to a demand letter. Possible approach:Illustrative counsel moves (not a promised result): (1) one-page map of inspection clause, cited standards, and when the objection clock starts; (2) lock the surveyor’s credentials, report number, full text, and sampling notes; (3) separate “left the plant OK” from “OK at port” — which gate does the contract use; (4) bilingual notice/claim letter listing failed items, clause bases, and a deadline for written reply (repair, replace, price cut, or take-back), with proof of service; (5) weigh holding the balance against mitigation (sell usable lots, sort); (6) if a joint re-inspection is needed, agree sampling rules first. Partner inspectors can run the physical check; demand letters and legal theory stay with the firm.

Explore the scenario
Illustrative port scene for advance-payment and delivery checksHypothetical

supplier-dispute

Hypothetical: Advance paid — contract name and payee do not match, then silence

Scenario & challenge:Story setup: A LatAm importer, introduced by an acquaintance, signed an English PO with a trading company and paid the first advance. Two weeks later: WeChat mute, email bounce, factory line dead. Finance only then saw the bank slip — the payee name did not fully match the contract header; a short-form sat in between. Public filings showed the contract entity still “in business,” but shareholders and address did not match the chat “boss”; the payee account pointed elsewhere. The buyer wanted police, demand letters, and collectors at once. What was missing: who is the counterparty, who received the money, was there a written change of payee, and what theory the evidence can support. This is not a three-day recovery thriller — it is pinning the risk points first. Possible approach:Illustrative moves: (1) public-registry check of the contract entity’s code, status, shareholders, and outbound investments; (2) line up bank payee name/account against the contract and any email payment instructions — match / mismatch list; (3) reconstruct whether chats or mail ever wrote “pay this account” in writing before the transfer; (4) timeline: sign → pay → go dark; (5) map options — demand refund/termination against the contract name, theories against the actual payee, whether a criminal complaint pack is worth preparing — each with evidence gaps and unknowns; (6) say plainly: if there are no assets or the shell is empty, procedure may go nowhere. Diligence-style checks first, then letters or filings — no guarantees.

Explore the scenario
Illustrative desk scene for trademark and platform complaint recordsHypothetical

trademark-ip

Hypothetical: Brand’s China listings taken down — complainant holds a China TM certificate

Scenario & challenge:Story setup: A North American consumer brand opened on a China marketplace; core SKUs were bulk-taken down on IP complaints. The complainant showed a China trademark certificate covering the class. The brand held US/EU marks and years of use, but China filings were pending or never filed. Ops wanted an instant counter-notice to relist; legal feared the platform follows China title documents and a blunt fight would fail again. Near-copycat shops also appeared on-platform. The clock: launch calendar, ad spend, inventory. Three threads to separate — how to answer the platform, whether China title can be challenged, and whether sales should rename or pause first. Possible approach:Illustrative moves: (1) pull complaint notices, title docs, and taken-down SKU lists; (2) check the complainant’s mark status (similars, assignments, opposition/invalidation windows); (3) build a platform defence pack (foreign title, prior use, licence chain) while stating the risk that the platform may keep listings down; (4) map opposition, invalidation, or other admin/civil options by evidence bar and rough timing — no promised outcome; (5) give sales a temporary naming/link plan so appeals do not amplify exposure; (6) public wording stays procedural — no “must be bad faith” claim.

Explore the scenario
Illustrative business architecture for JV governance and shareholder discussionsHypothetical

fdi-compliance

Hypothetical: Sino-foreign JV board deadlocks on capital call and dividends

Scenario & challenge:Story setup: A European industrial group and a Chinese partner run a manufacturing JV in Chengdu. Two board meetings in a row: the foreign side wants a capital call to expand; the Chinese side wants dividends first. Control of the legal-rep chop and bank tokens is also contested. The articles list director seats and “reserved matters,” but are fuzzy on how long a deadlock lasts, whether an interim manager can be appointed, and when share-transfer pre-emption triggers. HQ wants an options table readable in German/English: keep talking, call meetings under the articles, sue/arbitrate for exit or dissolution, and which tax/labour landmines go first. Nobody wants five words of “handle per law.” Possible approach:Illustrative moves: (1) line-by-line read of articles and JV contract — voting thresholds, legal-rep powers, deadlock/exit clauses; (2) map current Company Law / FDI rules: what the articles can do vs what only statute allows; (3) timeline of board notices, votes, chop and account control; (4) options matrix — keep negotiating with written meeting rules, call/written resolutions under the articles, share transfer or capital reduction, arbitration/litigation under the dispute clause — each with preconditions and unknowns; (5) flag labour, tax, customs, and guarantee cross-risks if any. No promise to “break the deadlock” or force a capital call.

Explore the scenario
Illustrative port scene for foreign-award recognition and enforcementHypothetical

maritime-arbitration

Hypothetical: Foreign award in hand — China recognition stalls on dossier and forum

Scenario & challenge:Story setup: A Southeast Asia buyer obtained a foreign arbitration award (claims upheld) on an equipment sale and heard the respondent had an affiliate and possible assets in a PRC city. Internally people already said “we can enforce.” Then the file: award missing full service exhibits, arbitration “agreement” only email scans, Chinese translation unchecked, asset leads stuck at “heard there is a plant.” Respondent’s counsel teed up “no agreement,” excess of mandate, and procedural objections. Management asked how soon money could be frozen — recognition review and enforcement are two steps, and the stall points need saying before the celebration continues. Possible approach:Illustrative moves: (1) Convention-aligned gap list — award originals/certificates, agreement, service and tribunal composition records, translation and authentication; (2) domicile/asset/place-of-business nexus for the right intermediate court — if weak, say so in writing; (3) preview common procedural defences and reply outlines; (4) explain recognise-then-enforce, and when preservation sits relative to enforcement; (5) turn asset rumours into a verifiable open-source plan — do not plead “heard there is a plant.” Recognition turns on statute and court review; this story presets neither a grant nor collection.

Explore the scenario
Illustrative desk scene for OEM brand licences and tooling recordsHypothetical

trademark-ip

Hypothetical: OEM factory puts a near-copy mark on its own domestic SKUs

Scenario & challenge:Story setup: A UK brand ran multi-year OEM in South China — drawings, tooling fees, packaging design all from the brand. Domestic e-commerce then showed factory-style SKUs with a near-identical word mark and near-copied colour blocks. The factory said: domestic is another line, the mark is ours, the contract only bars “exporting the same model.” The brand’s China TM map was incomplete — core class registered, but whether trade dress qualifies as influential packaging depends on use proof. The PO was an English template; the Chinese version went soft on “no near-mark goods.” The brand needed online links stopped without triggering a supply cut or tooling hostage. Possible approach:Illustrative moves: (1) map OEM/PO IP, tooling ownership, and non-compete / no-near-mark clauses — strong points vs soft wording; (2) lock live links, physical packaging, tooling payments, and design delivery proof; (3) check the factory (and affiliates) TM filings; (4) weigh cease-and-desist, platform complaints, admin leads, and civil filing in parallel, plus contract answers if supply stops or tooling is held; (5) strengthen the brand’s China mark and trade-dress evidence pack — no promised infringement finding or takedown. An OEM relationship alone does not bar the factory from its own brand — the fight sits on contract text and title.

Explore the scenario
Illustrative desk scene with quality inspection records and samplesHypothetical

supplier-dispute

Hypothetical: Port sampling fails — buyer wants price cut or return; factory only says “per contract”

Scenario & challenge:Story setup (not a real client): A European food-ingredient importer ordered a China-origin lot. After arrival, third-party sampling under the contract method failed a microbe limit. The factory replied on WeChat with “per contract — inspection risk is yours” and waved a pre-loading self-check pass. The buyer is stuck on three points: how many days after arrival for written objection; whether the lab stamp matches the contract’s named lab; and part of the cargo already cleared into warehouse, so return shipping is expensive. Purchasing wants a public “quality fraud” blast; legal counsel worries absolute language will hurt later claims. Possible approach:Illustrative moves (no promised result): (1) map inspection, quality-objection, and risk-transfer clauses to a written-notice deadline; (2) lock sampling method, sealed-sample photos, custody notes, and the full lab report; (3) test whether the factory’s pre-load self-check can defeat an arrival third-party report; (4) structure price cut, replacement, partial return, or termination — and note how further sales affect mitigation; (5) bilingual letter with a negotiation window while keeping forum options. Evidence first, numbers later; do not sign full-and-final early.

Explore the scenario
Illustrative port scene for advance-payment and delivery checksHypothetical

supplier-dispute

Hypothetical: Sample passed — then bulk specs change while they push for a large advance

Scenario & challenge:Story setup: A North American brand OEM’d consumer electronics with a “factory.” Small samples passed; chat was smooth. Before bulk, the other side suddenly changed the BOM and mould-cost split, and pushed a larger advance to a personal or affiliate account that did not match the contract header — WeChat: “pay today or lose the line.” Public filings showed a narrow business scope and a young entity; chats sometimes named another factory short-form. The buyer asks: normal commercial pressure, or time to stop and verify the entity? This story deliberately is not “case cracked, money back” — it is red flags, evidence lock, demand letters, and whether to file. Possible approach:Illustrative moves: (1) red-flag table (payee vs header, unsigned spec changes, urgency scripts, entity age/scope); (2) public-registry check of code, equity, status; (3) before further payment, demand in writing: corporate account matching the contract, written spec-change confirmation, line/mould ownership notes; (4) if partial payment already left, build a chronology and bilingual letter with a cure/clarify deadline; (5) forum-clause screen for preservation options (asset hints, evidence situs) — a screen, not a freeze promise. No “case cracked” ending.

Explore the scenario
Illustrative desk scene for trademark and platform complaint recordsHypothetical

trademark-ip

Hypothetical: Listing yanked overnight — rights pack or counternotice?

Scenario & challenge:Story setup: A cross-border marketplace seller finds a hero listing taken down overnight on an IP complaint. The complainant filed trademark or design papers; the seller believes the goods are self-designed or licensed, but the portal only gives a short appeal window. Ops wants an instant counternotice to “get traffic back”; legal sees a missing link in the licence chain, China TM classes that do not map cleanly to the platform category, and hero images using unlicensed third-party art. The question: complete a rights pack first, or rush a counternotice? Will that invite heavier platform sanctions? Should opposition/invalidation or infringement-defence materials run in parallel? Possible approach:Illustrative moves: (1) export complaint ID, takedown reason, and rule screenshots; (2) build a rights pack (registrations, licence chain, design provenance, listing timeline); (3) weigh counternotice facts vs misrepresentation risk; (4) check China TM/design status for parallel admin paths; (5) public wording stays “materials filed per platform rules” — no “will be restored” promise.

Explore the scenario
Illustrative business architecture for JV governance and shareholder discussionsHypothetical

fdi-compliance

Hypothetical: Foreign minority shareholder wants the books — Chinese directors say “trade secret”

Scenario & challenge:Story setup: A foreign party and a Chinese partner formed an inland manufacturing JV; the foreign side holds under half. Two quarters of numbers do not match shipment volumes. The foreign shareholder asks in writing for accounting books and key contracts; Chinese directors reply that trade secrets require majority approval, and push the shareholders’ meeting. The articles have a deadlock clause with fuzzy triggers; the foreign finance secondment has lost ERP login. The foreign side does not want an immediate unwind — but will not inject more capital while blind. Possible approach:Illustrative moves: (1) map Company Law information rights and articles procedure into a compliant inspection request; (2) lock refusal records, access-revocation logs, and meeting notices; (3) parse deadlock, exit, transfer, and dispute-clause triggers; (4) weigh a negotiated audit scope against preparing an information-rights path; (5) keep the request specific and purpose-stated so it is harder to paint as harassment. No preset court win or buyout price.

Explore the scenario
Illustrative port scene for foreign-award recognition and enforcementHypothetical

maritime-arbitration

Hypothetical: Foreign award in hand, China assets rumoured — then a jurisdiction objection

Scenario & challenge:Story setup: A Southeast Asian trader holds a foreign arbitral award on a sale contract and hears the respondent has equity or receivables in a PRC city. On filing for recognition/enforcement, the other side raises a jurisdiction objection: assets not in that court’s territory, disputed arbitration agreement, alleged service defects. Management asks “can we freeze the money?” Counsel must first map nexus, dossier gaps, and reply order — this story stops at procedure prep, not “collected.” Possible approach:Illustrative moves: (1) award, agreement, service proofs, authentication/translation checklist; (2) public and lawful tips on domicile, assets, place of business — pick candidate intermediate courts; (3) Convention and domestic review grounds → outline replies to jurisdiction and procedural objections; (4) explain recognise-then-enforce and separate preservation tests; (5) recognition turns on statute and court review — no preset outcome.

Explore the scenario
Illustrative desk scene for OEM brand licences and tooling recordsHypothetical

trademark-ip

Hypothetical: Brand licence expired — factory still ships labelled goods to third channels

Scenario & challenge:Story setup: A European apparel brand licensed a South China factory for private-label production. After expiry, the brand finds the factory still shipping marked goods to a Middle East distributor. The factory says there was an oral “sell-down” and that hangtag moulds remain on site. The brand holds China registrations, but the licence is thin on post-expiry destruction, mould return, and third-channel sales. Customs and marketplaces may get pulled in. In a few days the brand must choose: cease letter, customs IP recordal support, or stock buyback talks — without torching other live POs. Possible approach:Illustrative moves: (1) lock licence dates, renewal traffic, and whether any “sell-down” is in writing; (2) preserve shipping docs, hangtag/pack photos, and third-channel links; (3) bilingual letter: stop use, return moulds/plates, inventory count and disposition deadline; (4) weigh customs IP recordal and marketplace complaint packs in parallel; (5) separate contract-breach and trademark-infringement evidence maps. No promised seizure or takedown.

Explore the scenario

China counsel for overseas clients

Send a case summary to discuss fit

Include where you are based, the China counterparty’s name, payment and contract highlights, and your goal. A form submit is not an engagement. WhatsApp is coming soon — use the form, email, or phone [Pending] for now.